Please be advised that all lanes of QEW Fort Erie bound, beyond Northshore Blvd/ Hwy 2 to the south of the Burlington Skyway will be fully closed from:
10:00 p.m. on Saturday July 22nd, and will re-open at 11:30 a.m. on Sunday July 23rd, 2023
The above-mentioned closure will result in the following closures:
- All lanes QEW Fort Erie bound, beyond Northshore Blvd/ Hwy 2 to the south of the Burlington Skyway will be closed.
- The on-ramp to QEW Fort Erie Bound from Northshore Blvd/Hwy 2 southbound will be fully closed.
- The on-ramp to QEW Fort Erie Bound from Plains Rd Southbound will be fully closed
- The on-ramp to QEW Fort Erie Bound from Fairview Street Southbound will be fully closed QEW Niagara-bound Collector Lane split at Eastport Drive (N-S Ramp, North of the Canal), will be closed
The closure is for construction and is weather permitting.
Sign detour will be in place via Eastport Drive.
Motorists are advised there may be delays and are to plan alternate routes for the duration of the closure.
For real-time updates on these and other scheduled events in Central Region, please link to ‘Traffic Reports’ via the Ontario 511 website (http://www.ontario.ca/511).