A Public Information Centre has been arranged to present the evaluation of alternatives, the preliminary details of the Technically Preferred Alternative, and proposed measures to minimize or avoid impacts. The Technically Preferred Alternative includes replacing the existing Bowen Road bridge to the south of the existing alignment with a 4-lane cross section and reconfiguring the Bowen Road interchange to a Parclo A4 interchange configuration. Members of the public, residents and stakeholders are invited to attend the PIC.
The PIC will be held as follows:
Date: June 24, 2014
Time: 4:00 – 8:00 p.m.
Location: Town Hall Atrium
1 Municipal Centre Dr.
Fort Erie, Ont.
The PIC will be an informal drop-in centre and representatives from MTO and URS will be available to answer questions and discuss the study. For more information, please contact:
Alice Lam, P. Eng.
Senior Project Engineer
Highway Engineering – Hamilton / Niagara
Ministry of Transportation, Central Region
Building D, 4th Floor, 1201 Wilson Ave.
Downsview, Ont. M3M 1J8
416-235-5584
alice.lam@ontario.ca